© 2019 Nationwide Sureties Ltd is authorised and regulated by The Financial Conduct Authority Firms Ref No 304552
Office address :-Nationwide Sureties Ltd, No.1 Old Hall Street, Liverpool L3 9HG,

Nationwide Sureties Ltd Registered in England. Co Number 3732977. View our Privacy Policy Here.
Registered office: 3rd Floor, Granite Buildings, 6 Stanley Street, Liverpool L1 6AF

Website Created by Engage

 

Modular Housing Partnership To Help Solve Housing Crisis

August 28, 2018

Architectural practice, astudio, has introduced a revolutionary modular housing partnership in the hopes of reducing the cost of modular housing, providing high-quality homes and offering a possible solution to the UK’s housing crisis.

 

amodular, is astudio’s proprietary modular building method with Be First, the London Borough of Barking and Dagenham’ s pioneering regeneration company.

 

The advanced volumetric modular construction method developed by astudio enables the expedited assembly of low-energy homes, fitted-out, completed and manufactured offsite using  up-to-date methods of construction to provide robust, high-design modular housing.

 

astudio’s homes are supplied on a turnkey standardised production basis. Costs are reduced through bulk purchasing of materials and components. The small selection of standardised modules speeds up production and reduces the potential for flaws during build. Multiple fixtures, fittings and cladding options both internally and externally are available, allowing each building to have a distinctive look and feel.

 

Working in collaboration with Be First and offsite modular manufacturer Rollalong, astudio’s ground-breaking approach is being implemented in two new developments in the borough, at Mellish Close and Sugden Way in Barking.

 

Consisting of eight council flats in Mellish Close and 13 in Sugden Way, the homes will be built in perfect accordance with building and health & safety build regulations, more sustainably, cost-efficiently and within an accelerated time-frame of 60 weeks (which is just over a year) from design to handover compared to the 24-30 months it would take for traditional builds, saving the council key resources.

 

Richard Hyams, Co-founder and CEO of astudio, said: “We are delighted to be working in close partnership with Be First and the London Borough of Barking & Dagenham to help address the critical housing shortage in the borough, using our amodular proprietary production method.

 

“It is vital that landowners, developers, local councils and the community collaborate if we are to free up land and develop innovative solutions to address the critical shortage of housing in this country. It makes sense that one of those innovations is modular housing.  We believe that in the very near future, building will become like car production, with houses becoming quality manufactured products.”

 

Iain Ferguson, Commercial Director for Be First, added: “At Be First we are determined to increase the pace and quality of development in Barking and Dagenham. So, we are excited to be working with astudio on this ground-breaking scheme which we expect to reduce costs and deliver top-class housing in a fraction of the normal build time.” 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

55 Council Homes To Be Built At Former School In Dumbarton

April 29, 2019

1/10
Please reload

Recent Posts
Please reload

Archive